
This is where preparation meets planning.
When scoping a multi- level property damage project we initially check for electrical hazards.
This beautiful church structure was faced with a major pipe burst incident in the middle of winter. When we arrived on-site the ceiling had caved in and the hardwood flooring on all levels was swollen beyond repair. We mitigated this property for almost one full week. Rest assure we were able to save quite a bit of materials using dehumidification coupled with the correct amounts of air movement.